+86-13910131656
hqjgzjg@163.com
Home
About Us
Company Profile
About the Chairman
Corporate culture
Scientific and technological research
Honor
Service Philosophy
Products
Tunnel bilateral synchronous longitudinal pouring system
High-speed railway beam-forming dedicated pump
High-speed railway girder hydraulic spreading machine
Case
Construction Case of Beam-Producing Conveying Pump
Construction Case of Beam-Forming and Concrete Placing Machines
Tunnel Conveying Pump Construction Case
Ultra-High-Pressure Pump Construction Case
Blog
Company News
Industry News
Contact Us
Contact Information
Online Message
2026-07-27
Previous:
None
Next:
Xinxiang Machinery Factory of the Tunnel Bureau: two sets of 12-valve units and one set of 13-valve units have been shipped.
More information
Longwang Railway Project: Shipment of the 15-valve material distribution system.
Shipment of the 15-valve material distribution system for the Wang Railway Project of Bureau No. 5, First Division.
Shipment of ultra-narrow conveyor pumps for the Changwang Railway Project by Fujian Dingsheng Tongda Construction Engineering Co., Ltd.
Shipment of the Linpai Highway Section 1’s 90‑ton high‑altitude pump and 19‑valve material distribution system.