+86-13910131656

hqjgzjg@163.com

language
    Huaqiang Jinggong Huaqiang Jinggong
    • Home

    • About Us

        About Us
        • Company Profile

        • About the Chairman

        • Corporate culture

        • Scientific and technological research

        • Honor

        • Service Philosophy

        About Us
    • Products

        Products
        • Tunnel bilateral synchronous longitudinal pouring system

        • High-speed railway beam-forming dedicated pump

        • High-speed railway girder hydraulic spreading machine

        Products
    • Case

        Case
        • Construction Case of Beam-Producing Conveying Pump

        • Construction Case of Beam-Forming and Concrete Placing Machines

        • Tunnel Conveying Pump Construction Case

        • Ultra-High-Pressure Pump Construction Case

        Case
    • Blog

        Blog
        • Company News

        • Industry News

        Blog
    • Contact Us

        Contact Us
        • Contact Information

        • Online Message

        Contact Us

    language

      In Section 3 of the Yifu Railway project, an additional four sets of two-valve material distribution systems have been added.


      2026-04-08

      In Section 3 of the Yifu Railway project, an additional four sets of two-valve material distribution systems have been added.
      +
      • In Section 3 of the Yifu Railway project, an additional four sets of two-valve material distribution systems have been added.

      Previous:

      China Railway First Group Materials & Trade Co., Ltd. – Valve Sub‑assembly System No. 19 Shipment

      Next:

      Concrete pump delivered to the Yifu Railway Project in Fuling, Chongqing.

      More information

      Longwang Railway Project: Shipment of the 15-valve material distribution system.

      Xinxiang Machinery Factory of the Tunnel Bureau: two sets of 12-valve units and one set of 13-valve units have been shipped.

      Shipment of the 15-valve material distribution system for the Wang Railway Project of Bureau No. 5, First Division.

      Shipment of ultra-narrow conveyor pumps for the Changwang Railway Project by Fujian Dingsheng Tongda Construction Engineering Co., Ltd.

      Shipment of the Linpai Highway Section 1’s 90‑ton high‑altitude pump and 19‑valve material distribution system.

      Huaqiang Jinggong · China

      Manager He:

      +86-139 1013 1656

      Landline:

      +86-22-82102577


      • Home

      • About Us

        • Company Profile

        • About the Chairman

        • Corporate culture

        • Scientific and technological research

        • Honor

        • Service Philosophy

      • Products

        • Tunnel bilateral synchronous longitudinal pouring system

        • High-speed railway beam-forming dedicated pump

        • High-speed railway girder hydraulic spreading machine

      • Case

        • Construction Case of Beam-Producing Conveying Pump

        • Construction Case of Beam-Forming and Concrete Placing Machines

        • Tunnel Conveying Pump Construction Case

        • Ultra-High-Pressure Pump Construction Case

      • Blog

        • Company News

        • Industry News

      • Contact Us

        • Contact Information

        • Online Message

      Product Management
      • All
      • Product Management
      • News and Information
      • Introduction content
      • Enterprise outlets
      • Frequently Asked Questions
      • Corporate Video
      • Company Portfolio
      Search
      Huaqiang Jinggong (Tianjin) Technology Co., LTD.
      Huaqiang Jinggong (Tianjin) Technology Co., LTD.
      Huaqiang Jinggong (Tianjin) Technology Co., LTD.
      Facebook Linkedin Twitter Tumblr Pinterest

      Powered by www.300.cn | SEO | Privacy Policy

      Image name

      Jin Public Security Bureau Filing No. 12011402001139

      Business license